Tuesday 26 July 2016

Why Isolation is required b/w ON to OFF(Standby) block ?

Generally we see that Isolation is required b/ OFF to ON block. But in some design isolation cells are inserted b/w ON to OFF(More correct to say standby) block as well. This is called as Parking .

This is required for some signals which are having many load in OFF(Standby) block. i.e clock/reset. This will insure that clock/reset does not toggle when domain is in OFF(Standby) state. And which in turn will prevent switching/toggling of many sequential elements in shutdown domain . And hence we can reduce power consumption.

No comments:

Post a Comment